.... Specialising in reducing accelerated erosion

Industrial and Mining Reclamation

Industrial reclamation can provide significant challenges with regards to soil conditions, soil erosion, establishment of vegetation, and rehabilitation of watercourses to enhance fish & wildlife habitat. Addressing these issues should be part of a comprehensive erosion control and re-vegetation / plan for both industrial reclamation or mining reclamation.

A soil bioengineering approach, in combination with conventional engineering, can provide the tools needed to address these various site conditions. Terra Erosion Control has been involved in pipeline right-of-way reclamation projects, both in north and south America, including implementing work in right-of-way crossings or adjacent to riparian areas. We have successfully prescribed and implemented the rehabilitation of a re-constructed waterway on an overburden mining dump in the oil sands region of northern Alberta . We have also completed large projects on contaminated industrial sites in southern British Columbia where we both developed and implemented the treatments.

 

Placement of muskeg
Aurora Inter-Site pipeline right-of-way

Placement of muskeg

 
Riverbank Restoration Project
Teck Cominco Metals, Trail, British Columbia

Riverbank Restoration Project, Teck Cominco Metals Ltd.

 

Aurora Inter-Site pipeline right-of-way
Beaver Creek, Fort McMurray, Alberta

Aurora Inter-Site pipeline right-of-way


Link to these Industrial and Mining Reclamation Projects:

Control of Accelerated Gully Erosion on Pipeline Right-of-Way (T-Pit Hill) NEW

Teck Cominco Riverbank Restoration Project (Teck Cominco) NEW

Establishment of vegetation to control surface erosion and stabilize slope failure on Pipeline Right-of-Way (Beaver Creek) NEW

Control of Soil Erosion in Re-Constructed Waterway on Alberta Oil Sands Overburden Dump (Alpha Swale) NEW

Reclamation of Contaminated Lands Adjacent to Lead-Zinc Smelter (Duncan Slope Phase I and II) NEW

Reclamation of Contaminated Lands Adjacent to Lead-Zinc Smelter (Duncan Slope Phase III and IV) NEW

 

 

home

Copyright © 2010 Terra Erosion Control Ltd.

Industrial and Mining Reclamation