|
|
|
|
| |
Syncrude Canada Ltd.
>> Fort McMurray, Alberta, Spring/
Summer/ Fall 2003
Site assessment and trials establishment of soil bioengineering
techniques on re-habilitated mine dump and watercourse.
Prescription development, training of local crew and implementation
of project.
|
| |
 |
| |
B.C. Hydro Keenleyside Dam
>> Castlegar, B.C. Summer/ Fall
2003: Re-establishment of vegetation on previously constructed
berm to provide fish habitat. Prescription development
and implementation of project.
|
| |
|
| |
Canadian Pacific Railway
>> Elk River, Elko, B.C. Fall
2003: Vegetated riprap using live cuttings and placement
of root wads clusters to enhance fish habitat and provide
bank protection. Assisted in construction and implementation
of project.
|
| |
 |
| |
Braderwoods Strata Council
>> Nelson, B.C. Fall 2003: Site
assessment and prescription of slope failure. Implementation
of bioetechnical slope stabilization treatment.
|
| |
 |
| |
Ministry of Transportation and Highways
|
| |
|
Riondel, B.C. Spring 2003: Walkers Landing
Road, steep slope stabilization of slope failure using
soil bioengineering treatment. Prescription development
and implementation of project using “Spyder hoe”
to perform machine- assisted planting. |
| |
|
|
Moyie, B.C. Spring 2003: Moyie 18 Mile Pit steep
slope stabilization of debris slide using soil bioengineering
treatment. Prescription development and implementation
of project. |
| |
|
|
Moyie, B.C. Spring 2002: Moyie Bluff steep slope
stabilization using soil bioengineering treatment. Prescription
development and quality control of project |
| |
|
|
Edgewood, B.C. Summer 2001: Root wads and vegetated
crib wall establishment for bank stabilization and
enhancement of fish habitat on the Inonoaklin River. |
| |
|
|
Salmo, B.C. Spring 2001: Slope stabilization of large
slope failure within riparian area using soil bioengineering
techniques, addressing water drainage and sedimentation
input into Sheep Creek. |
| |
|
|
Creston, B.C. Spring 2001: Vegetated RipRap, Goat
River, Site maintenance and monitoring. |
| |
|
|
Creston, B.C. Summer 2000: Vegetated RipRap, Goat
River. Implementing vegetative treatment within riprap
on bridge approach. |
|
| |
 |
| |
Private Land, Veterinary Clinic
>> Creston, B.C. Spring 2003:
Stabilization of eroded slope using biotechnical slope stabilization
techniques.
Prescription development and implementation of project.
|
|
 |
| |
Dawson Construction Limited
>> Moyie, B.C. Spring 2003:
Moyie Bluff steep slope stabilization using soil bioengineering
treatment. Prescription development and implementation
of project. Trial treatment on two sites using “Straw
wattle” and “compost application”
in conjunction with live cuttings and seeding.
|
| |
 |
| |
Transportadora de Gas del Peru
>> Upper Amazon, Peru, Spring/,Summer/
Fall 2002: Evaluation and recommendation of erosion/sediment
control and slope stability control measures for the Camisea
gas pipeline system. Training and direction of local personnel
as well as the establishment of two trial sites using soil
bioengineering techniques.
|
| |
 |
| |
Klohn Crippen Consultants Ltd. Nelson
office |
| |
|
Thrums, B.C. Winter 2003:
Stream Bank Protection Assessment and Bioremediation Prescription.
Brilliant reservoir. Columbia Power Corporation. |
| |
|
|
Salmo, B.C. Spring 2002: South Salmo
Slide Review. Columbia Basin Fish & Wildlife Compensation
Program. |
| |
|
|
Shore Acres, B.C. Spring 2002: Slope
Protection Assessment and Bioremediation Prescription,
Thiessen Property, Brilliant reservoir. Columbia Power
Corporation |
| |
|
|
Castlegar, B.C. Spring 2001: Vegetated
Rip-rap/Bank Stabilization - Drazdoff Property –
Brilliant Reservoir Established 27 pockets of live
cuttings. Planting of native shrub seedlings and seeding.
Columbia Power Corporation |
| |
|
|
Kootenay River Dyke Repairs, Nelson, Fall
1999. Revegetation Plan Review. |
|
| |
|
| |
Kalesnikoff Lumber Co. Ltd. |
| |
|
West Kootenay, B.C. Summer
2002: Soil bioengineering / Riparian habitat restoration,
Bald Face Creek Soil bioengineering / Upper slope
stabilization, Shroeder Creek. |
|
Nelson, B.C. Fall 2001: Manual deactivation
of old road system to reduce sediment delivery into
domestic water supplies, helicopter access. |
| |
|
|
Blewett, B.C. Spring 2000: Soil Bioengineering,
Rover/Connor Creek, Site maintenance (repair and pruning),
and completion of stabilization project. |
| |
|
|
Nelson, B.C. Fall 1998: Soil Bioengineering,
Rover & Connor Creek, Site assessment and implementation
of biotechnical slope stabilization treatment. Installation
of a catchment basin to bridge water over unstable headscarp
of Referendum Creek landslide.
|
|
| |
|
| |
Meadow Creek Cedar Ltd. |
| |
|
· Coffee Creek, B.C.
Fall 2001: Installation of five large sediment traps
at bottom of landslide to reduce sediment delivery into
fish bearing stream. Planting of riparian species.
|
| |
|
|
Nelson, B.C. Fall 1999: Soil Bioengineering,
Coffee Creek. Site assessment and implementation of
biotechnical slope stabilization trial treatment on large
gully. |
|
| |
|
| |
Tembec Industries Inc. |
| |
|
Cranbrook, B.C. Fall, 2001:
Riparian Restoration and Fish Habitat Restoration.
Live gravel bar staking; establishment of 12,000 live
gravel bar stakes over 9 gravel bars using hand crews
and excavator to assist planting within Bighorn Creek.
|
| |
|
|
Cranbrook, B.C. Fall, 2001: Soil Bioengineering
Treatment for Landslide Rehabilitation Matthew Creek,
as well as upgrade and maintenance of two sites established
in fall of 2000 near Kimberley, B.C. |
| |
|
|
Cranbrook, B.C. Fall 2000: Riparian
Habitat Restoration Bighorn Creek Site 1 and 2, near
Elko, B.C. Site assessment and prescription of eroded
stream bank. Implementation of bioetechnical slope stabilization
treatment and planting of native shrub seedlings and seeding
of a large riparian area. |
| |
|
|
Cranbrook, B.C. Fall 2000: Soil Bioengineering
Treatment for Landslide Rehabilitation Matthew Creek.
Implementation of site prescription developed by Polster
Environmental Services. |
|
| |
|
| |
Nelson Waldorf School
>> Nelson, B.C. Spring 2001:
Cut slope stabilization behind newly constructed building.
Establishment of three rows of brush layers combined
with fascine bundles and mycorrhiza fungus inoculation.
|
| |
 |
| |
Downie Street Sawmills Ltd. |
| |
|
Revelstoke, B.C. Spring 2001: Bioremediation,
Akolkolex River FSR, km 21. Site 2. Completion of
section 1, using soil bioengineering techniques, alder
seedlings and grass seeding. |
| |
|
|
Revelstoke, B.C. Spring 2000: Bioremediation, Akolkolex
River FSR, km 21. Site 2, Site maintenance and completion
of project implementation using biotechnical slope stabilization
treatment. |
| |
|
|
Revelstoke, B.C. Fall 1999: Soil Bioengineering,
Akolkolex River FSR, km 21, Site 2, Site maintenance
(repair and pruning), and completion of project.
|
| |
|
|
Revelstoke, B.C. June 1999: Soil Bioengineering,
Akolkolex River FSR, km 21. Site 2, Site assessment
and implementation of biotechnical slope stabilization
treatment. |
|
| |
Pope and Talbot Ltd. |
| |
|
Nakusp, B.C. Spring 2001: Soil
Bioengineering / Riparian Habitat Restoration Heart Creek
Site 1 and 2, near Fauquier, B.C. Completion of site
started in the Fall of 2000. |
| |
|
|
Nakusp, B.C. Fall 2000. Soil Bioengineering
/ Riparian Habitat Restoration Heart Creek Site 1 and
2, near Fauquier, B.C. Site assessment, prescription
and implementation of bioetechnical slope stabilization
treatment and planting of native shrub seedlings and seeding.
|
|
| |
|
| |
Harrop Procter Watershed Protection Society
>> Procter, B.C. Spring 2000:
Training of youth crew in live staking installation as
erosion control prevention on Mill Creek hiking trail.
|
| |
 |
| |
M.O.E.L.P. Columbia Forest District, Kootenay
Region |
| |
|
Revelstoke, B.C. Spring 2000: Bioremediation/
Riparian Habitat Restoration, Akolkolex River FSR, km
21. Site 3, Site maintenance and repair. |
| |
|
|
Golden, B.C. Spring 2000. Bioremediation/ Riparian
Habitat Restoration, Moose Creek, Beaverfoot Valley,
Site prescription and implementation of biotechnical slope
stabilization treatment. |
| |
|
|
Revelstoke, B.C. October 1999. Bioremediation/ Riparian
Habitat Restoration, Akolkolex River FSR, km 21. Site
3, Site assessment and implementation of biotechnical
slope stabilization treatment. |
| |
|
|
Golden, B.C. Fall 1999. Bioremediation/ Riparian
Habitat Restoration, Moose Creek, Beaverfoot Valley,
Site assessment and harvesting of live material to be
placed in cold storage for spring project. |
| |
|
|
Revelstoke, B.C. June 1999. Soil Bioengineering
/ Riparian Habitat Restoration, Akolkolex River FSR, km
21. Site 1, Site assessment and implementation of
biotechnical slope stabilization treatment. |
| |
|
|
Nelson, B.C. May, 1999. Hawkins Creek Dike Planting,
Compensatory Habitat Project, Site assessment and
implementation of mounds, planting of native shrubs and
grass seeding. |
|
| |
|
| |
Creston, Community Forest Corporation
>> Erickson, B.C. Fall 1999:
Soil Bioengineering, Sullivan Creek. Site maintenance
(repair and pruning), and installation of cross ditches.
|
| |
 |
| |
Kootenay Lake Forest District |
| |
|
Nelson, B.C. Fall 1999: Soil
Bioengineering, Busk Creek. Site maintenance and monitoring.
|
| |
|
|
Nelson, B.C. Fall 1999: Landslide and
Erosion Channel Rehabilitation of Smallwood Creek,
Site assessment and implementation of biotechnical slope
stabilization treatment on three different sites. |
| |
|
|
Nelson, B.C. Fall 1998: Bioremediation,
Busk Creek, Landslide rehabilitation using various
types of willow structures and sediment traps (with rocks,
logs, and straw bales), silt fences (Geo. textile), grass
seeding and mapping. |
|
| |
|
| |
Atco Lumber Ltd
>> Nelson, B.C. Fall 1998: Give
Out Creek, Installation of coconut matting on side
cast materials on downstream side of bridge, using live stakes
to secure matting and grass seeding.
|
| |
 |
| |
Crestbrook Forest Industries Ltd. |
| |
|
Yack, B.C. Fall 1998: Soil Bioengineering,
Russell Creek, Site assessment and implementation
of biotechnical slope stabilization treatment including
the use of sediment traps. |
| |
|
|
Yack, B.C. Fall 1997: Bioengineering, Russell Creek,
Site assessment and implementation of biotechnical slope
stabilization treatment. |
|
| |
|
| |
Boundary Forest District
>> Fall 1998: Soil Bioengineering,
Hall Creek, Site assessment and implementation of biotechnical
slope stabilization treatment for demonstration site.
|
| |
 |
| |
Slocan Forest Products Ltd.
>> Slocan, B.C. Summer 1998:
Soil Bioengineering, Springer Creek, Site assessment
and implementation of biotechnical slope stabilization treatment
using dormant willow from cold storage.
|
| |
 |
| |
Nelson Forest Region
>> Nelson, B.C. Fall 1997. Soil
Bioengineering, Coffee Creek, Formal on site training
on implementation techniques on two different sites (1.1 &
2.2 km) and installation of various structures including willow
gathering.
|
| |
 |
| |
Arrow Forest District
>> Castlegar, B.C. Summer, 1996:
College Creek, Blueberry Community Watershed, Level
II road deactivation, assessment and prescription. Level III
machine supervision and implementation of major works, stream
bank rehabilitation, grass seeding and control of surface
erosion.
|
| |
|
| |
|
|